We found 0 results. View results
Your search results

Gas pipeline with connections, Pri Greftoch

Posted by BAUPOINT® on 17. February 2010
0

Realizácia

2010

Lokalita

Stupava, Pri Greftoch

Project information

The project deals with the gasification for residential zone in a new district of Stupava – on the hill near the forest, for individual construction of family houses in 23 lands.

  • Gas pipeline D 90, D 63
  • D 90 – length – 225 m, D 63 – length – 89 m
  • Gas connections D 32 length – 187 m – 23 pcs
  • Fine sand bed with thickness 0,3 m
  • Pipe installed with tracer wire according to the standard STN 347420, PVC-insulated wire of CY type with minimum cross-section 4,0 mm2
  • Recent projects

  • Compare Listings