Gas pipeline with connections, Pri Greftoch
Posted by BAUPOINT® on 17. February 2010
0
Realizácia
2010
Lokalita
Stupava, Pri Greftoch
Project information
The project deals with the gasification for residential zone in a new district of Stupava – on the hill near the forest, for individual construction of family houses in 23 lands.
- Gas pipeline D 90, D 63
- D 90 – length – 225 m, D 63 – length – 89 m
- Gas connections D 32 length – 187 m – 23 pcs
- Fine sand bed with thickness 0,3 m
- Pipe installed with tracer wire according to the standard STN 347420, PVC-insulated wire of CY type with minimum cross-section 4,0 mm2