Project Information

In a promising location in the village Vysoka pri Morave, a modern residential neighborhood of chain-link family houses will be built. The houses will be arranged in separate blocks, with access roads creating a peaceful inner residential zone, where streets are dominated by trees rather than cars. The area plans to develop 58 chain-link family homes.

The houses will be designed as compact, two-story units with flat roofs. The entrances to the homes will be located on the street side, while access to the garden area will be through a covered carport.

The project offers 4-room, two-story chain-link houses with an entrance hall, staircase, technical room with a shower, WC, living room with a dining area and kitchen on the ground floor, and an exterior-accessible storage room. The entire second floor is designed as a night and relaxation area, consisting of a bathroom, a walk-in closet, and three bedrooms. Each house has three private outdoor parking spaces and its own garden. A key feature is one parking space under a roof, which also serves as a link between the chain houses.

The plot is fenced with a rubberized mesh fence (on the garden side), while the parking spaces in front of the house and the access path are paved with interlocking tiles. The area behind the house (garden) is leveled and landscaped, with the terrace also built with interlocking tiles. A niche for energy meters and a space for a waste bin will be created at the front of the fence of each house.

 

  • Total number: 58 houses

  • Built-up area: 85 m²

  • Usable area: 119 m²

  • Number of floors: 2

  • Plot size: 306 – 539 m² (average 420 m²)

The chain-link family homes in this project represent a unique combination of modern and financially accessible housing. The newly developed residential area offers high-standard living with complete comfort, while being in harmony with nature. The residential project embodies timelessness, simplicity, quality, and a life filled with the joy of owning your own home. Your new address will be only 30 minutes by car from Bratislava.

The area is located in the village, outside the built-up zone, on the southeastern side of the village. The land is situated in the rural outskirts of the village, near an existing continuous row of family homes. To the northeast, the area is bordered by a local road, which will connect the newly created residential zone.

Walking Distance:

  • Primary school: 16 min (1200m)

  • Kindergarten: 10 min (750m)

  • Grocery store: 9 min (650m)

  • Post office: 12 min (900m)

  • Bus stop: 11 min (800m)

Benefits:

  • Chain-link development – connection via annexes, not living rooms

  • Direct access from the street to the garden area

  • Three parking spaces on private plots

  • Energy-efficient living (heat pump)

  • Linear greenery – park between the residential area and the water canal

  • Excellent transport accessibility

  • Close to nature

  • Attractive, safe, and peaceful location

  • Family-oriented neighborhood

As part of the implementation of the IBV Vysoká pri Morave project, construction works are continuing on the development of the essential technical infrastructure for the future construction of terraced family houses. The sanitary sewer system and water supply network are currently in the final stages of completion, with the remaining finishing works and preparations for handover now underway.

The relocation of the existing overhead power line into a new underground cable system is also nearing completion. The final connection is scheduled to take place in the coming days, bringing the new distribution network into operation. This upgrade will improve the reliability of the electricity supply while also enhancing the overall technical and visual standard of the development.

Currently, work is focused on the finalization of the road infrastructure and the preparation of the subbase for the installation of paving blocks on the sidewalks. Once these activities are completed, the final works on the electrical power distribution network will be carried out.

Construction activities across the individual phases are progressing according to schedule, with the comprehensive technical infrastructure gradually taking shape. This infrastructure will ensure the site is fully prepared for the subsequent construction of the planned family homes.