Roads and sidewalks

The project deals with the road of class C3, category MO 7,5/40 and MOU 6,5/30 (STN 736110) and sidewalks, for individual construction of family houses in 27 lands.

  • road of class D1
  • category MO 6,5/40 – 312,5m
  • sidewalk of width 1,50m and in total length 315,00 m.
  • sidewalk of width 2,00m and in total length 287,35

block paving 60 mm
sub-base (sand or mortar) 40 mm
high-performance concrete 100 mm
compacted crushed rock hardcore 150 mm
________________________________________________

Total thickness:  350 mm

  • Crossing of sidewalks with OS2 and OS3 with barrier-free adjustment under the Decree No. 192/94 Coll.

Gas pipeline with connections

The project deals with the gasification for new residential zone in the South-West of Stupava for individual construction of family houses in 27 lands.

Gas pipeline with connections

  • Gas pipeline PE D 90×8,2 length – 301,97 m
  • Gas pipeline PE D 50×4,6 length – 110,83 m
  • Gas connections   PP PE D 32×2,9 length – 144,69 m – 29 pcs
  • Fine sand bed with thickness 0,3 m
  • Pipe installed with tracer wire according to the standard STN 347420, PVC-insulated wire of CY type with minimum cross-section 4,0mm2

Public street lighting

The project deals with wires, poles and arms of public street lighting for new residential zone in the South-West of Stupava for individual construction of family houses in 27 lands.

  • Length 484 m
  • Light source MALAGA
  • 15 pcs of poles height = 5 m

Public water supply

The project deals with drinking water supply for new residential zone in the South-West of Stupava for individual construction of family houses in 27 lands.

Public water supply with connections consists of:

  • HDPE pipeline 110×6,6 mm – length 305,32m
  • HDPE connections 40×2,4 mm – length 58 m
  • HDPE connections 32×2 mm – length 126 m
  • Underground fire hydrant DN80 – 3 pcs
  • Aboveground fire hydrant – 1 pc

Public rainwater sewage system

The project deals with the construction of public sewage system and road gullies of rainwater sewage system for residential zone in the South-West of Stupava for individual construction of family houses in 27 lands.

  • Public rainwater sewage system with road gullies – length 252m
  • Drainage shafts with depth 5 m – 4pcs under the road.
  • Road gullies – 4 pcs
  • Sewage maintanance shafts – 4 pcs

Public sewage system

The project deals with the construction of public sewage system and branches, for new residential zone in for residential zone in the South-West of Stupava for individual construction of family houses in 27 lands.

Public sewage system with connections consists of:

  • PVC pipeline DN300 with length 428,0 m (gravitational section),
  • Connecting pipeline DN160, 20 pcs
  • 13 pcs of maintenance sewage shafts DN1000 mm of precast concrete blocks with manhole DN600 mm and manhole cover DN600 mm.
  • Pipeline is placed on compacted sand sub-base in a trench of width 1 m secured with shoring and backfilled with sand to the height 30 cm above the pipeline

Roads and sidewalks

The project deals with the road of class C3, category MO 7,5/40 and MOU 6,5/30 (STN 736110) and sidewalks on the eastern border of Stupava, in the district of Kremenica on the hill near the forest, for individual construction of family houses in 23 lands.

  • road of class C3
    • category MO 8,5/40 – 101m
    • category MO 7,5/40 – 182m
    • category MOU 6,5/30 (STN 736110) – 101m
  • sidewalk of width 1,75m and roads of width 7,50 m in total length 280,00 m
  • block paving 60 mm
  • sub-base (sand or mortar) 40 mm
  • high-performance concrete 100 mm
  • compacted crushed rock hardcore 150 mm

_________________________________________________

Total thickness:  350 mm

  • Crossing of sidewalks with OS2 and OS3 with barrier-free adjustment under the Decree No. 192/94 Coll.

 

 

 

 

Roads and sidewalks

The project deals with the road of class C3, category MO 7,5/40 and sidewalks on the eastern border of Stupava, in the district of Kremenica.

  • road of class C3
  • category MO 7,5/40 (STN 736110) – 187,43m

Roads and sidewalks

The project deals with the road of class C3, category MO 7,5/40 and MOU 6,5/30 (STN 736110) and sidewalks on the eastern border of Stupava, in the district of Kremenica on the hill near the forest, for individual construction of family houses in 28 lands.

  • road of class C3
  • category MOU 6,5/30 (STN 736110) – 439,43m
  • sidewalk of width 1,75m and in total length 439 m
  • block paving 60 mm
  • sub-base (sand or mortar) 40 mm
  • high-performance concrete 100 mm
  • compacted crushed rock hardcore 150 mm

_________________________________________________

Total thickness:  350 mm

  • Parking area

 

Gas pipeline with connections

The project deals with the gasification for new residential zone on the eastern border of Stupava, in the district of Kremenica on the hill near the forest, for individual construction of family houses in 28 lands.

  • Gas pipeline with connections
  • Gas pipeline PE 100, D90×5,2 SDR 17,6
  • Gas pipeline D90, length – 460,3m
  • Gas connections   PE D 32, SDR 11 – 35 pcs
  • Fine sand bed with thickness 0,3 m
  • Pipe installed with tracer wire according to the standard STN 347420, PVC-insulated wire of CY type with minimum cross-section 4,0 mm2