Gas pipeline with connections

Informácie o projekte

  • Realizácia

    2010

  • Kategória

    Infrastructure

  • Location

    Stupava, Pri Greftoch

The project deals with the gasification for residential zone in a new district of Stupava – on the hill near the forest, for individual construction of family houses in 23 lands.

  • Gas pipeline D 90, D 63
  • D 90 – length – 225 m, D 63 – length – 89 m
  • Gas connections D 32 length – 187 m – 23 pcs
  • Fine sand bed with thickness 0,3 m
  • Pipe installed with tracer wire according to the standard STN 347420, PVC-insulated wire of CY type with minimum cross-section 4,0 mm2