Gas pipeline with connections

Informácie o projekte

  • Realizácia

    2014

  • Kategória

    Infrastructure

  • Location

    Stupava, Zadná Street

The project deals with the gasification for new residential zone in the South-West of Stupava for individual construction of family houses in 27 lands.

Gas pipeline with connections

  • Gas pipeline PE D 90×8,2 length – 301,97 m
  • Gas pipeline PE D 50×4,6 length – 110,83 m
  • Gas connections   PP PE D 32×2,9 length – 144,69 m – 29 pcs
  • Fine sand bed with thickness 0,3 m
  • Pipe installed with tracer wire according to the standard STN 347420, PVC-insulated wire of CY type with minimum cross-section 4,0mm2